case studies
Monash Health Kingston Centre, Victoria
88 Queensbridge Street, Melbourne
The Shed UTAS Willis Street, Tasmania
Dept. of Justice Office Building, Frankston
Sydney Metro Tunnel Project
Orbelo Mine Reclamation Works
Shurjoint H305 HDPE Couplings in Mining Operations
Kogan Creek Power Station
Shurjoint Products in Harsh Mining Conditions
Yuen Long Pat Heung Quarantine Centre
Lantau Island Penny’s Bay Quarantine Centre
Lei Yue Mun Quarantine Centre, Hong Kong
Kowloon West Terminus, Hong Kong
Kai Tak NKIL No. 6552, Hong Kong
Kwong Wah Hospital
Lei Yue Mun Quarantine Centre, Hong Kong
The Lei Yue Mun Quarantine Centre in Hong Kong has recently begun construction with the aim of housing people identified as having been in contact with confirmed cases of Coronavirus and will be ready in just 1-2 months.
The project was made with Modular Integrated Construction (MIC) and due to the project requiring construction within a couple of months, the Hong Kong governemnt decided to use our VSH Tectite Sprint range as an efficient and time saving push-fit pipe connection.

VSH Tectite
VSH Tectite is a high-quality package of copper, stainless steel and brass push fittings, valves and accessories which are suitable for drinking water, heating, cooling and compressed air installations.
316 (stainless steel)
Classic
Irish
Pacific
Pro
Sprint
VSH Tectite accessories
VSH Tectite valves


