case studies

Sydney Metro Tunnel Project

Australia’s biggest public transport project. In 2024, this new, stand-alone railway will have 31 new metro stations and 66km of metro rail. The fully automatic metro trains will begin service in 2019. There are currently three parts to Sydney Metro:

• Sydney Metro Northwest (Tallawong to Chatswood), due to
open in 2019, with a train every four minutes in the peak.
• Sydney Metro City & Southwest (Chatswood to Bankstown),
work started in 2017; and
• The recently announced Sydney Metro West (Sydney CBD to
Parramatta), which is still in early planning and development.

Key facts:
• 15.5km twin metro railway tunnels
• 5 Tunnel Boring Machines (TBMs)
• 6 new station boxes
• Sydney Metro has the ultimate capacity to run a train every two minutes in each direction under the Sydney CBD
• 99,000 pre-cast tunnel segments built on site at Marrickville

VSH Shurjoint products including Z07 rigid couplings, 7120/7121 tees, M21/7721 mechanical tees, 7110/7111 elbows, 7150/7151 reducers and other ductile iron fittings are used for the tunnel’s fire protection system.

location

Gympie, Queensland, Australia